Network Components
Dual Rail Guideway Pre-Stressed, Post-Tensioned Concrete Beams — Typically Manufactured Offsite
Maximum Grade (est) 15%
Guideway Span 30 metres (Typical)
Stations Steel/Concrete/Fabric Construction
Station Access Multi Level, through Gate Control to Platform
Switching Turntable Switching, Electro-Hydraulic or Multiple Link
Switch Control Auto/Manual with ATP (Automatic Train Protection) Interlocking
Depot Facilities (Prime) Track Loading Crane, Heavy and Light Maintenance, Workshops and Train Cleaning
Typical Operation & Capacity
Operation Mode Staggered Bi-directional, Parallel Operation or Pinched Loop
Headway Below 2 minutes
Train Control Driver Controlled or Driverless (Upgrade Option)
Ticketing System Frazer-Nash MIST Contactless System
Seamless Multi-Modal Integration
Gate Access MIST Ticket to Operate Gates and for Revenue Collection
Control Centre Facilities
• Mimic Panels, Control Consoles, Communications Consoles
• CCTV Security Monitoring and Recording
• ATC (Automatic Train Control) and E-SCADA (Enhanced Supervisory Control and Data Acquisition) Terminals
• UPS Backup
• Fire Control
Communications & Control
Drive & Anciliary Control Frazer-Nash AMPS Multiplexed Data and Control System
• Train to Control Centre
• Control Centre to Train
• Train to Train
• Voice Communications based on Dedicated Cab Radio and additional GSM and 3G Networks
• Systems Health, E-SCADA, CCTV and Positional Data Radio Link
• Security Systems, Public Address, IT Display Area
Specifications subject to change without notice